Sunday, June 14, 2015

Summer House List - The sequel

Here's where we stand with our current projects, both with the permitted work we pulled last fall, and our summer house list.  I checked of somethings that I haven't blogged about  yet.  I also added some new items that cropped up... and very few of these pictures I'd call current.




Eve’s Room
    Finishing mudding, sanding, priming and painting Eve's room. 
    Install door and frame window. 
    Install window blinds. 
    Pass inspection (!)
    Move crap out, clean and move Eve back in.
    Decorate and get furniture for Eve.


 New Linen Closet/Upstairs Hall
    Finish framing/painting the closet door. Install closest door for realz.
    Install new floor molding.  Paint old and new molding.
    Pass inspection (!)
    Organize closest and hang wall items.

 Master Bedroom
   Install new domer window. Repair floor/walls, and everything else that was leaked on from old window.
   Sort clutter and donate items.
   Move crib in.
   Buy/Build changing table
   Make 'nursery'  area where clutter was.

Living Room
    Sand, paint and 'install' molding around floors, new and old. 
    Build, stain and seal transitions to the laminate flooring from hall.
    Frame new wall opening.
    Build up shelves for kids drawing table.
    Pass inspection (!)

 Hallway/Entryway
    Patch holes in ceiling and wall of hallway/entryway. 
    Build coat hook bar hang coat hooks
    Paint and install molding around floors of new wall.
    Pass inspection (!)
    Build a built in coat rack… someday.


Downstairs bathroom/Laundry Room
    Adjust cupboards and repair wall behind them.
    Mud, sand, prime and paint.
    Caulk around sink.  Caulk around counter.
    Sand and paint heater.
    Cut down counter so the dryer doesn’t stick out.
    Buy/Build, paint and hang hooks and drying racks.
    Possibly buy new washer and dryer… if I can beg Jon into it.


Computer Desk
    Build, seal, paint and install sliding printer shelf.
    Build, seal and install middle and upper shelves.
    Attach power strips cords and router to desk.
    Build a little paper divider shelf
    Prototype hinges for keyboard/laptop shelf. 
    Build, seal and install keyboard shelf. Build seal and install laptop shelf.
    Put molding around the base and top of cabinet.
    Buy/make cabinet doors, paint and install.
    Upgrade computer – new monitors, fix crashes, new speakers, new case that fits in cabinet.
 
Kitchen
    Paint
    Build, seal and install a sliding pot shelves (x2).
    Buy and install a kitchen faucet.  Repair area under sink.
    Figure out broken dishwasher problem, order part, install and wash a whole lot of dishes.

Basement
    Buy and install or repair our basement door.
    Donate the donations!
    Clear out, organize, and burn scrap wood.
    Mitigate mold issues until a real gutting can be done

Electrical
Upgrade all switches to white ones
Upgrade all outlets to white tamper resistant outlets

Remove lightswitch from upstairs hall, and rewire other switch
Add outlet/light to upstairs hall

Add recessed lights for eve's room
Re-rout switch from outlet to lights
Add extra outlets to Eve's room in key places
Move switches from demo and under window
Add extra outlets to Boys room behind dresser
Add ceiling light to boys room
Re-rout switch from outlet to light

Add smoke alarms to all three bedrooms, wired to the existing hardwired smoke alarms
Add closet light to new closet w/switch
Add outlet for dustbuster in new closet

Add recessed lights in office
Add recessed lights in livingroom
Add extra outlets in livingroom where needed (computer, TV, etc)
Finish coax installation behind TV 
Replace and fix the dimmer switch in dining room.



Outdoor stuff (All clumped together for now)
    Put in new front steps.  Put in a new walkway.
    Set up a raised garden bed, mulch, remove poison ivy, add another fruit tree, make our lawn grow grass again.
    Get/build a new compost bin, and put it closer to the house.
    Finish digging up the sinkhole, and then filling it in.
    Get an engineer to look at drainage.  Fix what we can around the porch, deck and driveway
    Put in a longer bar across the playset and add some new swings.  Build a sandbox and stock with sand.
    Take down most of the old deck, salvage enough to still have a small deck.
    Repair pool liner, get pool started for the season, build/buy some sort of ladder so we (I) can get in.
    Finish building up the campfire, get it inspected, and start burning some of the wood on our lawn.  Stain log seat.
    Install some sort of clothes line.


Um, okay, some of those pictures are crazy old.  Like, when-we-moved-in old.  I think I need to go through the house and take some updated, full room pictures.  I'm pretty sure I'm more focused on the indoor list, because that's the stuff I do the most of.  Outdoor is a much bigger mix of Jon and I.

Really though, I just want to see our progress on the list. Current pictures could help too.  But man, having the electrical checklist from before, and seeing it now makes me real happy to see.  I'm actually holding off on the few switches/outlets I have left, since those will be easy enough to do when I get into the third trimester.  Living up the second right now, trying to get as much as I can done!  Let check off more of the list!